General notes from a project I have been asked to bid...........talk about your 'CYA' cover your ass, clause!

General Notes:
A. Do not scale drawings
B. Elevations and details on this set of drawings are not to be specifics for the jobsite, please quote only intended generalities based upon Architects understanding
C. Please price colors and products specified for all cabinetry, millwork, and tops, i.e.: Solid Surface Tops to be Corian Class 'B' or better
D. Please note that all colors and manufacturer's of all materials can change without notice, and your pricing of this project should reflect all possibilities
E. Architect not responsible for any details or specifications
F. Installation of manufactured items, materials, and equipment in strict accordance with the Architects intent


Rokrayne
Whoever says Paper beats Rok is an idiot. Next time I see someone say that I will throw a rok at them while they hold up a sheet of paper........
86er
Legacy
Legacy
Posts: 3699
Joined: Sep 13, 2005
Location: Las Vegas

Re: Would you quote this project?

Post by 86er »

D. Please note that all colors and manufacturer's of all materials can change without notice, and your pricing of this project should reflect all possibilities
fuck that shit.
Redrum
Legacy
Legacy
Posts: 255
Joined: Aug 01, 2008
Location: Savannah Georgia

Re: Would you quote this project?

Post by Redrum »

I do quotes all day....FUCK that dude.



EDIT*....Oh man the text editor censor had me rolling on the floor. I originally thought Salarys comment "anus that shit" was weird ><
I'm the White Rabbit.
Rokrayne
Legacy
Legacy
Posts: 602
Joined: Jun 03, 2007
Location: Minnesota, USA

Re: Would you quote this project?

Post by Rokrayne »

Of course I am not bidding this. I found out from the general contractor that this project has been designed by the owners friend who just graduated college 2 months ago.......I was absolutely dumb-founded after reading the specifications and had to share this level of ineptness.

Rokrayne
Whoever says Paper beats Rok is an idiot. Next time I see someone say that I will throw a rok at them while they hold up a sheet of paper........
Redrum
Legacy
Legacy
Posts: 255
Joined: Aug 01, 2008
Location: Savannah Georgia

Re: Would you quote this project?

Post by Redrum »

I was going to say that...

I have run across quote requests that has a similar feel, wanting you to basically price everything including five different methods of shipping.

EVERY TIME it is a FRESH grad that has no idea what they are doing. I work in the concert/movie industry and this quote request shit is always followed by, oh ya and I need this at the end of the week, on a holiday, in Mexico...
I'm the White Rabbit.
Kordolin
Legacy
Legacy
Posts: 1787
Joined: Sep 14, 2005
Location: Atlanta, GA

Re: Would you quote this project?

Post by Kordolin »

Rokrayne wrote:...friend who just graduated college 2 months ago...
ughhhhh. That's me in 18 months! That's some major /facepalm though.

How are you supposed to price cabinets and stuff if you don't even know the dimensions they would need to be?
Sit vis vobiscum.
May the dp/dt be with you.

- Support Muphrid! World of Mechanicscraft | Scaling Mechanics
- Complete Mage Compendium
- Proven Mage Theorycrafting
Sternn
Registered Member
Posts: 95
Joined: Oct 05, 2007
Location: North Carolina

Re: Would you quote this project?

Post by Sternn »

They have at least quadrupled the cost of their project IF they can find anyone that will bid on it.

I had an old contracts and specs prof say years ago that standard AIA specs and contracts may not be the greatest in the world, BUT everyone legally knows what every if, and , or, etc... means and knows how to decipher it.